Project introduction:
The project has 184 condominiums and some business units. It is a commercial and residential project. The total height of the building is about 250 feet.
Including:
Projects completed before 2019: Planning approval, construction drawing design, foundation engineering construction permit approval, house pre-sale permit.
The project has started in March 2019.
Due to the collaboration with the Hawaii Department of Health on the soil reporting project and the impact of COVID-19, the soil reporting project for the current project has been completed.
During the period of 2025-2026, the construction drawings are being revised. The originally approved planning drawings are retained, including 184 condominiums, 3 commercial shops on the first floor, and the original approved floor plans remain unchanged. The structural engineering construction drawings are being revised. The original land property division is retained. The original approvals from the planning department and the municipal government council (TOD) for the special transportation area project are retained. The pre-sale permits for the houses are also retained.
Latest commencement date of the project:
The project is planned to commence in October 2026, be completed in
August 2029, and obtain the residence permit and property ownership
certificate in December 2029.
View of the street view of the project in HONOLULU: Click here
Project website: www.alamoana-condo.com (Click to view)
Project related attachments:
1. Business Development Plan of the project for September 2024
2. Construction project general contractor cost of the Project for September 2023
3. Project Brochure for September 2023
4. Rendering of the project from 2015 to 2022
5. Business Development Plan of the project for February 2021
6. Total Construction Cost of the project for February 2021
7. Land Value Evaluation Analysis Report of the project for February 2021
8. Residence Type Introduction of the project
Govenment Documents of the Project:
1. Foundation Building Permit of the project
2. House Pre-sale Document 2 of the project
3. House Pre-sale Document 3 of the project
4. Special District Development Permit of the project
6. Establishment Health Management Plan (EHMP) of the project
7. I-924 Approval Letter of the Project (issued by USCIS)
Govenment Documents of the Project:
1. Foundation Building Permit of the project
2. House Pre-sale Document 2 of the project
3. House Pre-sale Document 3 of the project
4. Special District Development Permit of the project
6. Establishment Health Management Plan (EHMP) of the project
7. I-924 Approval Letter of the Project (issued by USCIS)
Documents related to the parcels of project:
1. Information about land transactions in 2015
2. Land Title Report (710 Sheridan Street Honolulu)
Construction lans:
2. Construction drawings of foundation works
3. Structural engineering construction drawings
4. Water SupplyFire FightingAir Conditioning Construction Drawing
5. Electric construction drawing
6. Civil construction drawings
7. Sewage engineering construction drawing
8. Garden engineering construction drawing
Contact: Johnson FANG
Email: thlusa@gmail.com
Add: 227 W Valley Blvd 288#B, San Gabriel, CA 91776
CopyRight © 2010-2030 USA Realty Construction Group, INC Right Reserved. Sitemap
Add: 227 W Valley Blvd 288#B, San Gabriel, CA 91776